google-site-verification=PrB1eRtQD4WiA3xMusCBO5_Uic9NLsAhSgn8pTtfep8

Set Up and Re-Roping Instructions Models DS9 and DL14

Raising your Sunshine Clothesline; insert the assembled SSCL into the Ground Socket, leaving a minimum of 7” of Center Post in the Ground Socket. Rotate the Dryer until the Latch Bracket faces you. Partially raise the Arms by placing your foot on the Foot Clamp holding it to the ground. While raising the Arms always look for rope tangles which might interfere with fully raising. Grasp two opposing Arms near the top and spread them out as wide as possible. Grasp them again this time, lower and raise them as high as easily possible. In order to be in good position to raise the Arms completely, duck under 3 to 5 rows of rope. With the Lock Lever pointing up, raise the Arms until you can connect the Lever Bolt to the lowest slot in the Latch Bracket. Grasp the end of the Lever and pull it down until the over center motion locks the Arms in place.

       

 

Leave a comment

Name .
.
Message .

Please note, comments must be approved before they are published